Commercial fit out
Fit-out projects for offices, industrial and other commercial space, run to one programme with certified electrical work handed over at completion.

Why it matters
A commercial fit out involves more trades running in parallel than most projects: electrical, data, mechanical and finishes all need to land in the same window. Electrical work has to be certified to BS 7671 before handover, and a programme that isn't coordinated up front slips as trades queue behind each other.
ILUX runs the fit out end to end and hands over a complete certificate and O&M pack at completion.
What's included
- Programme built to the confirmed completion date, working back through every trade
- Electrical first and second fix to BS 7671, with certification issued at handover
- Data and comms cabling installed and tested ahead of go-live
- Mechanical and containment works coordinated with the electrical programme
- Snagging closed out before handover, not after occupation
- O&M manuals and certificates compiled into one pack at completion
For a business with several units to fit out over time, the same specification and programme repeat at each one, so the second project starts from a known baseline.
A fit out is only as fast as its slowest trade.
Electrical, data and mechanical works all land in the same short window. See how we sequence multiple trades on one site without them queueing behind each other.
Occupied and phased projects
Where a building stays in use during the works, the programme is phased so occupied areas stay safe and operational while the fit out moves through the rest of the space. See office refurbishments for how that's typically run.
Common questions.
Do you work to our confirmed handover date?
Yes. The programme is built backwards from the handover date and we flag early if any trade puts it at risk.
Can the building stay occupied during the works?
Often, with a phased programme. See office refurbishments for how phasing is typically handled.
What do we get at handover?
A full certificate pack for the electrical installation plus O&M manuals, all held in your portal alongside your other sites.
Handover day, held.
Tell us your completion date and we'll show you what the programme looks like.